As we build a bath "on-black"
The construction of any of the bath process is very laborious and not so quick. The most important thing to decide that should come out in the end. What is the product You wish to receive.
In this case, we with the chief architect of the project have studied the main design objectives for about a month. Solve the following tasks:
-what temperature should keep the oven in doubles room
-retention time temperature
-how to adjust the temperature mode
-what should be the heat capacity of the furnace
-the time necessary for the preparation of the furnace and bath in general
"the withdrawal of smoke and methods of ventilation pair of the room
-fire-prevention measures and heat insulation
-design of the window in doubles room
-general layout pair of the room
-what kind of material installed on the lining of the walls and the ceiling around the furnace
-from what wood is better to make the carpenter part of the steam room
-the design of the room

As a result of joint work with the architect, expert on the SPA massage and professional парильщиком-masseur have developed the following task:

-working temperature in the steam room should be in the range of 80-than 850°c
-the temperature on the stones of the furnace - 400-450 C
-time working process without compromising the quality of a pair of not less than 4 hours
-adjustment of the air heating steam ensure, by means of two dampers in the oven (if necessary forced to put positive pressure)
-heat capacity of the furnace should be not less than 300кВт thermal energy
-time for the preparation of the furnace and a steam bath after a long idle - not less than 5 hours.
( furnace fire, ventilation, cleaning of the premises from the soot)
-the time of preparation of the furnaces of the steam room the next day after протопки - not less than 3 hours.
-removal of smoke in the process of heating and ventilation due to the forced smoke exhaust system with the help of the fan, resistant to high temperatures and aggressive environments.
-ceiling above oven, completely made of fireproof material, namely sheet metal (station), with elements of artistic forging. Heat insulation and fire-fighting cuts to do with double standards.
-the window size 600x600, tempered glass, heat-resistant with a snap and seals.
-layout - the main regiment length not less than 2.5 m, width-0,9m.
-wood-stopped on the domestic breed of tree - linden.

Like any bath, we began to build on the stove, in the sense started manufacture of oven and adjacent structures. The furnace itself is made of refractory bricks SHA-5. Put it in a clay solution. The walls and the lining of the furnace performed from refractory bricks of manual manufacture, covered with glaze. Very expressive texture, it is well placed soot.
Set one cauldron for cold water (capacity 120l;) next to the furnace. The second cauldron for hot water supply (capacity 120l;) hung above the oven. Height adjustment values - with the help of a winch. The walls of the brick warmed camp - 50mm basalt. Ceiling - 200mm basalt. In the upper part of the walls near the ceiling made a hole for the forced smoke exhaust system.
With the long промучились. Could not for a long time to choose the necessary accessories.
On the general layout is the layout is very simple, classical. The main thing that would have been easy.

The construction took quite a long time (2 months). Test - 2 weeks.
As a result the customer got what wanted - a real classic bath "on-black" with its unique color, smells, and on modern technologies (beautiful, convenient and practical).